<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.2 20190208//EN"
  "https://jats.nlm.nih.gov/publishing/1.2/JATS-journalpublishing1.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink"
         xmlns:mml="http://www.w3.org/1998/Math/MathML"
         article-type="research-article"
         dtd-version="1.2">

  <!-- ============================================================ FRONT -->
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">IJLTEMAS</journal-id>
      <journal-title-group>
        <journal-title>International Journal of Latest Technology in Engineering, Management &amp; Applied Science (IJLTEMAS)</journal-title>
        <abbrev-journal-title abbrev-type="publisher">IJLTEMAS</abbrev-journal-title>
      </journal-title-group>
      <issn pub-type="epub">2278-2540</issn>
      <publisher>
        <publisher-name>IJLTEMAS</publisher-name>
      </publisher>
    </journal-meta>

    <article-meta>
      <!-- IDs -->
      <article-id pub-id-type="publisher-id">169</article-id>
            <article-id pub-id-type="doi">10.51583/IJLTEMAS.2026.150700163</article-id>
      
      <!-- Categories -->
            <article-categories>
        <subj-group subj-group-type="heading">
          <subject>Education</subject>
        </subj-group>
      </article-categories>
      
      <!-- Title -->
      <title-group>
        <article-title>Nigeria’s Electric Power Sector Reform, Privatization and Post Reform (2000 - Present): An Analysis of the Current State of Generation Companies (Gencos) and their Ongoing Bottlenecks</article-title>
      </title-group>

      <!-- Authors -->
      <contrib-group>
                <contrib contrib-type="author">
                    <name>
            <surname>Abubakar Abba (Phd)</surname>
            <given-names>Rabiu</given-names>
          </name>
                              <aff>
            Rahammed Nigeria Limited (Management Consultants)                        <country>Nigeria</country>
                      </aff>
                    
        </contrib>
              </contrib-group>

      <!-- Volume / Issue / Pages -->
            <volume>15</volume>
                  <issue>7</issue>
                        <fpage>2131</fpage>
            <lpage>2151</lpage>
            
      <!-- Dates -->
      <history>
                <date date-type="received">
          <day>12</day>
          <month>08</month>
          <year>2026</year>
        </date>
                        <date date-type="accepted">
          <day>17</day>
          <month>08</month>
          <year>2026</year>
        </date>
              </history>

            <pub-date pub-type="epub">
        <day>26</day>
        <month>08</month>
        <year>2026</year>
      </pub-date>
      
      <!-- DOI Self-URI -->
            <self-uri xlink:href="https://doi.org/10.51583/IJLTEMAS.2026.150700163"/>
      
      <!-- Keywords -->
            <kwd-group kwd-group-type="author">
                <kwd>Power Sector</kwd>
                <kwd>Reform</kwd>
                <kwd>Privatisation</kwd>
                <kwd>Post Reform</kwd>
                <kwd>Generation</kwd>
                <kwd>Under-performance</kwd>
                <kwd>Industry Experts</kwd>
                <kwd>Blackouts</kwd>
                <kwd>Unstable Power</kwd>
                <kwd>Grids</kwd>
                <kwd>Liquidity Crisis.</kwd>
              </kwd-group>
      
    </article-meta>
  </front>

  <!-- ============================================================ BODY (Abstract) -->
  <body>
        <sec>
      <title>Abstract</title>
      <p>Before Privatization in 2013, Nigeria’s electricity sector was plagued by inefficiencies, inadequate investment, and persistent power shortages. Chronic under-performance in generation, distribution, and transmission led to unreliable supply, necessitating private sector-led reforms to improve efficiency, attract investment, and ensure cost-reflective pricing. However, soon after privatization, the sector began to witness a number of bottlenecks, including liquidity constraints, Disco’s under-performance, metering gaps, transmission constraints, financial sustainability risks, erratic contract implementation, vandalism and tariffs issues. These challenges almost brought the whole sector into a halt, with several grid breakdowns and incessant load shedding all over the country. The objective of this paper is therefore, to review the reform and privatization of the power sector from 2000 to date, with a focus on the analysis of the current state of generation companies and their ongoing bottlenecks. To achieve this objective, the study adopts a mixed method approach, which combines data analysis with insights from a variety of reliable sources, such as industry experts, institutional documentations and stakeholders. The outcome of the study indicates that the Nigeria’s Power Sector, particularly the generation sub sector though witnesses some level of improvement since privatization, but still grapples with a lot of uncertainties, leading to frequent breakdowns of grids, unstable power supply and recurring black outs. The study thus recommends the tackling of the staggering multi trillion-naira liquidity crisis in the generation sector, among many other issues.</p>
    </sec>
      </body>

  <!-- ============================================================ BACK (References) -->
    <back>
    <ref-list>
      <title>References</title>
            <ref id="ref1">
        <label>1</label>
        <mixed-citation>Achia, T., &amp; Wangombe, A. (2010). A Logistic Regression Model to Identify Key Determinants of Poverty Using Demographic and   Health</mixed-citation>
      </ref>
            <ref id="ref2">
        <label>2</label>
        <mixed-citation>Survey Data. Nairobi, Kenya. European Journal of Social Sciences, 13(1).</mixed-citation>
      </ref>
            <ref id="ref3">
        <label>3</label>
        <mixed-citation>Adams, B. N. &amp; Sydie, R. A. (2001). Sociological Theory, Sociology for a new Century: a pine</mixed-citation>
      </ref>
            <ref id="ref4">
        <label>4</label>
        <mixed-citation>forge press series, SAGE Publications, Inc. desina, K. (2016), An Operator’s Perspective  of the Nigerian  Power</mixed-citation>
      </ref>
            <ref id="ref5">
        <label>5</label>
        <mixed-citation>Sector. A paper Presented at Lagos Business School on June 1.</mixed-citation>
      </ref>
            <ref id="ref6">
        <label>6</label>
        <mixed-citation>Adesina, K. (2016). An Operators Perspective of the Nigerian Power Sector. A Paper Presented  at the Lagos Business School, June 1.</mixed-citation>
      </ref>
            <ref id="ref7">
        <label>7</label>
        <mixed-citation>Adenuga, A. (2023). An empirical analysis of institutional quality and foreign direct investment in Nigeria. Oradea Journal of Business and Economics, 80).</mixed-citation>
      </ref>
            <ref id="ref8">
        <label>8</label>
        <mixed-citation>Adenikinju, A., Dikko, H., Sanusi, G., (2016), Impacts of Privatisation on Electricity Supply in Nigeria, In A. Adenikinju, A. Jerome and</mixed-citation>
      </ref>
            <ref id="ref9">
        <label>9</label>
        <mixed-citation>O. Ogunkola, The Quest for Development: Essays in Honour of Professor Akin Iwayemi at 70, pp. 639-667</mixed-citation>
      </ref>
            <ref id="ref10">
        <label>10</label>
        <mixed-citation>Adebayo, A. E. (2012). Poverty and Inequality in South Africa: Meeting the Challenge.</mixed-citation>
      </ref>
            <ref id="ref11">
        <label>11</label>
        <mixed-citation>International Journal of Developing Societies, 1(2).</mixed-citation>
      </ref>
            <ref id="ref12">
        <label>12</label>
        <mixed-citation>Adebayo, A. V. &amp; Ainah, P. K. (2024). Addressing Nigeria's Electricity Challenges: Past,</mixed-citation>
      </ref>
            <ref id="ref13">
        <label>13</label>
        <mixed-citation>Present, And Future Strategies. American Journal of Applied Sciences and Engineering,</mixed-citation>
      </ref>
            <ref id="ref14">
        <label>14</label>
        <mixed-citation>5(2) 1-16. https://doi.org/10.5281/zenodo.12633012.</mixed-citation>
      </ref>
            <ref id="ref15">
        <label>15</label>
        <mixed-citation>Adegbulugbe, A. Akinbami, J. (2002), Policy Options for the Attainment of sustainable</mixed-citation>
      </ref>
            <ref id="ref16">
        <label>16</label>
        <mixed-citation>electricity supply in Nigeria. CBN Billion, 26(4),</mixed-citation>
      </ref>
            <ref id="ref17">
        <label>17</label>
        <mixed-citation>Adiatu Afeez (2024): Implications of Energy access deficit and Energy poverty in Nigeria.</mixed-citation>
      </ref>
            <ref id="ref18">
        <label>18</label>
        <mixed-citation>Adoyi Matthew Omale (2022). An Assessment of the Privatization of the Power Sector in Nigeria: A Study of Karu Local Government of Nasarawa State. International Journal of</mixed-citation>
      </ref>
            <ref id="ref19">
        <label>19</label>
        <mixed-citation>Comparative Studies in International Relations and Development p-ISSN: 2354-4198 | e-ISSN 2354-4201 Volume 8, Number 1 January 2022 I</mixed-citation>
      </ref>
            <ref id="ref20">
        <label>20</label>
        <mixed-citation>Aina, T. A. &amp; Salau, A. T. (1992). The Challenge of Sustainable Development in Nigeria</mixed-citation>
      </ref>
            <ref id="ref21">
        <label>21</label>
        <mixed-citation>Ibadan: Nigerian Environmental Study/Action Team (NEST).</mixed-citation>
      </ref>
            <ref id="ref22">
        <label>22</label>
        <mixed-citation>Akanonu, P. (2020), www.energy for growth.org/memo/reflections on Nigeria power sector</mixed-citation>
      </ref>
            <ref id="ref23">
        <label>23</label>
        <mixed-citation>privatization, retrieved on 14/12/2020.</mixed-citation>
      </ref>
            <ref id="ref24">
        <label>24</label>
        <mixed-citation>Arif, G. (2006). Targeting Efficiency of Poverty Reduction Programs in Pakistan Series, Manila: Asia Development Bank.</mixed-citation>
      </ref>
            <ref id="ref25">
        <label>25</label>
        <mixed-citation>Awan, A., Bilgili F. (2022). Energy Poverty Trends and determinants in Pakistan: Empirical</mixed-citation>
      </ref>
            <ref id="ref26">
        <label>26</label>
        <mixed-citation>evidence from eight waves of HIES 1999-2019.</mixed-citation>
      </ref>
            <ref id="ref27">
        <label>27</label>
        <mixed-citation>Ayuub, S. (2013). Impact of microfinance on poverty alleviation. A case Study of NRSP in</mixed-citation>
      </ref>
            <ref id="ref28">
        <label>28</label>
        <mixed-citation>Bahawalpur of Pakistan. International Journal of Academic 	Research in Accounting, Finance &amp; Management Sciences.</mixed-citation>
      </ref>
            <ref id="ref29">
        <label>29</label>
        <mixed-citation>Becker, G.S. (1975). Human Capital: A Theoretical and Empirical Analysis, with Special 	Reference to Education (2nd ed.). New York</mixed-citation>
      </ref>
            <ref id="ref30">
        <label>30</label>
        <mixed-citation>National Bureau of Economic Research.</mixed-citation>
      </ref>
            <ref id="ref31">
        <label>31</label>
        <mixed-citation>Bradshaw, Y.W.; Huang, J. (1991). Intensifying Global Dependency: Foreign debt, Structural</mixed-citation>
      </ref>
            <ref id="ref32">
        <label>32</label>
        <mixed-citation>Adjustment, and Third World Underdevelopment. Social. Q.</mixed-citation>
      </ref>
            <ref id="ref33">
        <label>33</label>
        <mixed-citation>Bureau of Public Enterprises Website, https://www.bpe.gov.ng</mixed-citation>
      </ref>
            <ref id="ref34">
        <label>34</label>
        <mixed-citation>Business Day Newspaper, November 26, 2025</mixed-citation>
      </ref>
            <ref id="ref35">
        <label>35</label>
        <mixed-citation>Chudi Nelson Ojukwu (2017). Unbundling as A Privatization Strategy: The Electricity Sector Reform</mixed-citation>
      </ref>
            <ref id="ref36">
        <label>36</label>
        <mixed-citation>in Nigeria. Nigeria Business Law Journal, 2017.</mixed-citation>
      </ref>
            <ref id="ref37">
        <label>37</label>
        <mixed-citation>Dertinger A., and Hirth L., (2020). Reforming the Electric Power Industry in Developing</mixed-citation>
      </ref>
            <ref id="ref38">
        <label>38</label>
        <mixed-citation>Economies, Evidence on Efficiency and Electricity Access Outcomes. Energy Policy.</mixed-citation>
      </ref>
            <ref id="ref39">
        <label>39</label>
        <mixed-citation>Eberhard, A., &amp; Godinho, C. (2017). A Review and Exploration of the Status, Context and</mixed-citation>
      </ref>
            <ref id="ref40">
        <label>40</label>
        <mixed-citation>Political Economy of Power Reform in Sub Saharan Africa, South Asia and Latin</mixed-citation>
      </ref>
            <ref id="ref41">
        <label>41</label>
        <mixed-citation>America. MIR Working Paper. University of Cape Town.</mixed-citation>
      </ref>
            <ref id="ref42">
        <label>42</label>
        <mixed-citation>Electricity Regulatory Index 2018 (AfDB), reegle.com, and study questionnaire.</mixed-citation>
      </ref>
            <ref id="ref43">
        <label>43</label>
        <mixed-citation>Emodi, N. V. (2016). The Energy Sector In Nigeria in Energy Policy for Sustainable</mixed-citation>
      </ref>
            <ref id="ref44">
        <label>44</label>
        <mixed-citation>Strategies The Case of Nigeria. Online Version Available from http:www.file/users /download./9789811000930.</mixed-citation>
      </ref>
            <ref id="ref45">
        <label>45</label>
        <mixed-citation>Ennis, H.; Pinto, S. (2002).  Privatization and Income Distribution in Argentina. Available online</mixed-citation>
      </ref>
            <ref id="ref46">
        <label>46</label>
        <mixed-citation>Hartley, P. (2012). Privatization and Reform of the Electricity Industry: How Mexico can 	Learn from the Mistakes of others. Available online.</mixed-citation>
      </ref>
            <ref id="ref47">
        <label>47</label>
        <mixed-citation>ICRC Website., https://www.icrc.gov.ng</mixed-citation>
      </ref>
            <ref id="ref48">
        <label>48</label>
        <mixed-citation>IEA (2020). World Energy Outlook Report</mixed-citation>
      </ref>
            <ref id="ref49">
        <label>49</label>
        <mixed-citation>Investment and Reforms in Africa (MIRA) Program Working Paper, University of Cape Town</mixed-citation>
      </ref>
            <ref id="ref50">
        <label>50</label>
        <mixed-citation>Graduate School of Business, 2017.</mixed-citation>
      </ref>
            <ref id="ref51">
        <label>51</label>
        <mixed-citation>Iseolorunkanmi, O.J. (2014). Issues and challenges in the privatized power sector in Nigeria.</mixed-citation>
      </ref>
            <ref id="ref52">
        <label>52</label>
        <mixed-citation>Journal of Scientific Research and Reports.</mixed-citation>
      </ref>
            <ref id="ref53">
        <label>53</label>
        <mixed-citation>Jamasb T., et al., (2005). Core Indicators for Determinants and Performance of the Electricity</mixed-citation>
      </ref>
            <ref id="ref54">
        <label>54</label>
        <mixed-citation>Sector in Developing Countries. World Bank Policy Research Working Paper 3599,</mixed-citation>
      </ref>
            <ref id="ref55">
        <label>55</label>
        <mixed-citation>2005,http://documents.worldbank.org/curated/en/659371468152083306/Core-indicators-for-determinants-and-performance-of-the-electricity-sector-in-developing-countries (accessed on 28 September 2021).</mixed-citation>
      </ref>
            <ref id="ref56">
        <label>56</label>
        <mixed-citation>Jamasb, T.; Mota, R.; Newbery, D.; Pollitt, M. (2005). Electricity Sector Reform in Developing</mixed-citation>
      </ref>
            <ref id="ref57">
        <label>57</label>
        <mixed-citation>Countries: A Survey of Empirical Evidence on Determinants and Performance, 2005. World Bank Policy Research Paper, No. 3549. Available online: http://documents.worldbank.org/curated/en/393231468780575236/Electricity-sector-reform-in-developing-countries-a-survey-of-empirical-evidence-on-determinants-and-performance (accessed on 28 September 2021).</mixed-citation>
      </ref>
            <ref id="ref58">
        <label>58</label>
        <mixed-citation>Jamasb, T.; Nepal, R.; Timislina, R.; Toman, Energy M. Sector Reform, Economic Efficiency  and Poverty Reduction, 2014, University of Queensland School of Economics</mixed-citation>
      </ref>
            <ref id="ref59">
        <label>59</label>
        <mixed-citation>Discussion Papers Series 529. Available online: http://www.uq.edu.au/economic s/abstract/529.pdf (accessed on 28 September 2021).</mixed-citation>
      </ref>
            <ref id="ref60">
        <label>60</label>
        <mixed-citation>Jamasb, T.; Nepal, R.; Timilsina, G.R. (2017).  A Quarter Century Effort Yet to Come of Age:</mixed-citation>
      </ref>
            <ref id="ref61">
        <label>61</label>
        <mixed-citation>A Survey of Power Sector Reforms in Developing Countries. Energy J.</mixed-citation>
      </ref>
            <ref id="ref62">
        <label>62</label>
        <mixed-citation>Joskow, P.L.; Schmalensee, R. (1983). Markets for Power: An Analysis of Electric Utility</mixed-citation>
      </ref>
            <ref id="ref63">
        <label>63</label>
        <mixed-citation>Deregulation; MIT Press: Cambridge, MA, USA.</mixed-citation>
      </ref>
            <ref id="ref64">
        <label>64</label>
        <mixed-citation>Kadiri, K.O., Agbaje, M.O., Alabi, A.O. (2015), Issues and challenges of ownership and privatization of power stations in Nigeria. Journal of Scientific Research and Reports.</mixed-citation>
      </ref>
            <ref id="ref65">
        <label>65</label>
        <mixed-citation>Khandker SR, et al. (2012). Are the Energy Poor also Income Poor. Evidence from India. 	IDEAS.</mixed-citation>
      </ref>
            <ref id="ref66">
        <label>66</label>
        <mixed-citation>Kolawale, J (2025). Search for viability in the Nigerian Electricity Supply Industry (NESI).</mixed-citation>
      </ref>
            <ref id="ref67">
        <label>67</label>
        <mixed-citation>Malik. A, (2024). Can Stronger and quality drive direct growth in BRICS? African Journal of</mixed-citation>
      </ref>
            <ref id="ref68">
        <label>68</label>
        <mixed-citation>Economic and Management Sciences.</mixed-citation>
      </ref>
            <ref id="ref69">
        <label>69</label>
        <mixed-citation>Mayrhofer, W. (2004). Social system theory as theoretical framework of human resources  management benediction or curse? Management Review.</mixed-citation>
      </ref>
            <ref id="ref70">
        <label>70</label>
        <mixed-citation>Newbery, D.M. (2003). Regulatory Challenges to European Electricity Liberalization. Swed.</mixed-citation>
      </ref>
            <ref id="ref71">
        <label>71</label>
        <mixed-citation>Econ. Policy Rev.</mixed-citation>
      </ref>
            <ref id="ref72">
        <label>72</label>
        <mixed-citation>Newbery, D.M. (2003). Network capacity auctions: Promise and problems. Util. Policy. Nigeria Independent System Operator, www.niso.org.ng</mixed-citation>
      </ref>
            <ref id="ref73">
        <label>73</label>
        <mixed-citation>North. D. C (1990). Institutions. institutional Change and economic performance. Cambridge</mixed-citation>
      </ref>
            <ref id="ref74">
        <label>74</label>
        <mixed-citation>University Press.</mixed-citation>
      </ref>
            <ref id="ref75">
        <label>75</label>
        <mixed-citation>NSIA and North South Power (2024), signing of JV agreement for Nigeria’s first 20MW Solar-hydro project. Nairametrics. https://nairametrics.com/2024/03/19/nsia-and-north-south-power-sign-jv-agreement-for-nigerias-first-20mw-solar-hydro-project/</mixed-citation>
      </ref>
            <ref id="ref76">
        <label>76</label>
        <mixed-citation>Nigeria enterprise survey. Tech. Rep. NGA_2014_ES_v01_M. The World Bank (2014).</mixed-citation>
      </ref>
            <ref id="ref77">
        <label>77</label>
        <mixed-citation>NBS, E-Library (2018). Website of the Nigeria Bureau of Statistics, 2018. Living standard measurement survey/general household survey.</mixed-citation>
      </ref>
            <ref id="ref78">
        <label>78</label>
        <mixed-citation>Onagoruwa, B. (2011), Nigeria Power Sector Reforms and Privatization. Available from:</mixed-citation>
      </ref>
            <ref id="ref79">
        <label>79</label>
        <mixed-citation>http://www.sec.gov.ng/files/ Bolanle%onagoruwa %20 presentation %20 60%20DG5SECpdf. [Last accessed on 2017 Nov 15].</mixed-citation>
      </ref>
            <ref id="ref80">
        <label>80</label>
        <mixed-citation>Peterson, M., (2022). Unsustainable Development: The Impact of Power Sector Reform on Policy Regimes in Sub Saharan Africa,</mixed-citation>
      </ref>
            <ref id="ref81">
        <label>81</label>
        <mixed-citation>Samuel, I., et, al (2019). Nigeria’s Electricity Power Sector Reform: An Appraisal of</mixed-citation>
      </ref>
            <ref id="ref82">
        <label>82</label>
        <mixed-citation>Unresolved Issues. International Journal of Energy Economics and Policy.</mixed-citation>
      </ref>
            <ref id="ref83">
        <label>83</label>
        <mixed-citation>Tech. Rep. Nigerian National Bureau of Statistics and World Bank (2019).</mixed-citation>
      </ref>
            <ref id="ref84">
        <label>84</label>
        <mixed-citation>Tinuoye, K. (2017), Nigerian Power Sector Report: Is There Light at the</mixed-citation>
      </ref>
            <ref id="ref85">
        <label>85</label>
        <mixed-citation>End of the Tunnel? Available from: http://www,unitedcapitalpicgroup.com. [Last accessed on 2018 Jul 20].</mixed-citation>
      </ref>
            <ref id="ref86">
        <label>86</label>
        <mixed-citation>Tinuoye, K. (2017), Nigerian Power Sector Report: Is There Light at the</mixed-citation>
      </ref>
            <ref id="ref87">
        <label>87</label>
        <mixed-citation>End of the Tunnel? Available from: http://www,unitedcapitalpicgroup. com. [Last accessed on 2018 Jul 20].</mixed-citation>
      </ref>
            <ref id="ref88">
        <label>88</label>
        <mixed-citation>Tinuoye, K., (2017). Nigeria’s Power Sector Report. Is there Light at the end of the Tunnel?  http:www.unitelcapitalpicgroup.com</mixed-citation>
      </ref>
            <ref id="ref89">
        <label>89</label>
        <mixed-citation>Olukanmi, I. J. (2020) Issues and challenges in the privatized power Sector in Nigeria, Journal of Sustainable Development Studies 6 (1)</mixed-citation>
      </ref>
            <ref id="ref90">
        <label>90</label>
        <mixed-citation>Punch Newspaper, Nigeria, Friday, April 10, 2026.</mixed-citation>
      </ref>
            <ref id="ref91">
        <label>91</label>
        <mixed-citation>REA (2024) Activates a Combined 200KWP Capacity Solar Mini Grids in Edo State Communities. REA. https://rea.gov.ng/rea-activates-combined-200kwp-capacity-solar-mini-grids-edo-state-communities/ REA (2024) Third quarter Report. Nigeria Electricity Regulatory Commission.</mixed-citation>
      </ref>
            <ref id="ref92">
        <label>92</label>
        <mixed-citation>Revisiting Reforms in the Power Sector in Africa Final Report prepared for the African Development Bank and Association of Power Utilities of Africa 15 March 2019.</mixed-citation>
      </ref>
            <ref id="ref93">
        <label>93</label>
        <mixed-citation>Samuel S. I. et al., (2019). Nigeria’s Electricity Power Sector Reform: An Appraisal of</mixed-citation>
      </ref>
            <ref id="ref94">
        <label>94</label>
        <mixed-citation>Unresolved Issues.  International Journal of Energy Economics and Policy, 2019, 9(6).</mixed-citation>
      </ref>
            <ref id="ref95">
        <label>95</label>
        <mixed-citation>Schultz, T. W, (1971). Investment in Human Capital: The Role of Education and of Research. New York</mixed-citation>
      </ref>
            <ref id="ref96">
        <label>96</label>
        <mixed-citation>Sen, A., Jamasb, T. (2012). Diversity in Unity: An Empirical Analysis of Electricity</mixed-citation>
      </ref>
            <ref id="ref97">
        <label>97</label>
        <mixed-citation>Deregulation in Indian States. Energy J. TCN Performance Improvement Plan (2022), Vol 1.TCN-PIP-Volume-1</mixed-citation>
      </ref>
            <ref id="ref98">
        <label>98</label>
        <mixed-citation>Transmission Company of Nigeria, https://www.tcn.org.ng UNIDO Annual Report 2008.</mixed-citation>
      </ref>
            <ref id="ref99">
        <label>99</label>
        <mixed-citation>World Bank. (1993). The World Bank’s Role in the Electric Power Sector: Policies for Effective Institutional, Regulatory, and Financial Reform, 1993. World Bank Report, No.11676.</mixed-citation>
      </ref>
            <ref id="ref100">
        <label>100</label>
        <mixed-citation>Yin, C., Qamruzzaman, M., (2024). Empowering renewable energy consumption through public-private investment, urbanization, and globalization: Evidence from CS-ARDL and NARDL. Heliyon 10 (4).</mixed-citation>
      </ref>
            <ref id="ref101">
        <label>101</label>
        <mixed-citation>Zhao, Y., Tang, K.K., Wang, L.-l., 2013. Do renewable electricity policies promote renewable electricity generation? Evidence from panel data. Energy Policy 62.</mixed-citation>
      </ref>
          </ref-list>
  </back>
  
</article>
